We are doing site work in preparation for paving a driveway in one of our client’s Greenwich CT property.
As you can see below in the gallery, reclaimed authentic cobble stone was used to create a stone border around the driveway. In addition, milled blacktop was used for patching prep work. We are also installing proper drain system to prevent flooding.
While the prep work associated with paving can seem messy, the end result is sure worth it. We will post pictures showing the final results soon.
Learn more about our driveway paving services or view our portfolio here.